February 4, 2011
Agenda
Action Sheet
Audio
Recap: Planning Commission's 6-1 vote recommends Board of Supervisors approve 521-home, 230 multi-family residence, mixed-use Campus Park project in Fallbrook, with recommendations
Final Environmental Impact Report for Campus Park Master Planned Community
TABLE OF CONTENTS
FINAL EIR INTRODUCTION
SUMMARY
1.0 PROJECT DESCRIPTION AND ENVIRONMENTAL SETTING
2.0 SIGNIFICANT ENVIRONMENTAL EFFECTS THAT CANNOT BE AVOIDED IF THE PROPOSED PROJECT IS IMPLEMENTED
2.2 Transportation/Traffic
2.3 Air Quality
3.0 SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT THAT CAN BE MITIGATED
3.1 Noise
3.2 Geology/Paleontology
3.3 Biological Resources
3.4 Cultural Resources
4.0 ENVIRONMENTAL EFFECTS FOUND NOT TO BE SIGNIFICANT
5.0 ALTERNATIVES TO THE PROPOSED PROJECT
6.0 LIST OF REFERENCES
7.0 LIST OF EIR PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED
8.0 LIST OF MITIGATION MEASURES AND ENVIRONMENTAL DESIGN CONSIDERATIONS
APPENDICES
Appendix A: Notice of Preparation (NOP) and Comments on the NOP
Appendix B: Visual Impact Analysis
Appendix C: Traffic Impact Study
Traffic Tech Reports
Appendix D: Air Quality Technical Report - Global Climate Change Evaluation
Appendix E: Preliminary Noise Analysis
Appendix F: Geotechnical Assessment - Paleontological Resource Assessment
Appendix G: Biological Technical Report - Resource Management Plan - Conceptual Enhancement Plan - Conceptual Revegetation Plan
Appendix H: Cultural Resource Surveys
Appendix I: Water System Analysis - Sewer Service Analysis - Water Supply Assessment and Verification Report - Ten Percent Design Report for Lift Station - Project Facility Availability Forms - Contact Information
Appendix J: Conceptual Fire Protection Plan/Fuel Modification Plan
Revised FPP Tech Report 1/21/11
Appendix K: Mineral Resource Technical Report
Appendix L: Preliminary Hydrology and Hydraulics Study - Storm Water Management Plan - Preliminary Hydromodification Management Plan - Nitrate Report
Appendix M: Phase I Environmental Site Assessment and Limited Chemical Residue Survey - Well Destruction Permit - Hazardous Materials Questionnaire
Campus Park Specific Plan Amendment & General Plan Amendment Report
Appendix A: Land Use Plans and Policies Consistency Evaluation
Appendix B: Proposed Edits to Fallbrook Community Plan
Appendix C: Proposed Edits to I-15 Corridor Subregional Plan
Appendix D: Proposed Edits to Interstate 15 / Highway 76 Interchange Master Specific Plan
Appendix E: 1000 Scale Vicinity Map
Appendix F: Service District letters
Appendix G: County of San Diego Zoning Ordinance Summary
Graphics
Campus Park Grading Plans
Multifamily-1 Architectural Plans
Multifamily-1 Landscape Plans
Multifamily-1 Open Space Exhibit
Multifamily-1 Rec Building Plans
Multifamily-1 Site Plans
Multifamily-2 Architectural Plans
Multifamily-2 Landscape Plans
Multifamily-2 Open Space Exhibit
Multifamily-2 Site Plans
Professional Office Architectural Plans
Professional Office Landscape Plans
Professional Office Site Plans
Single Family Architectural Plans 1 of 3
Single Family Architectural Plans 2 of 3
Single Family Architectural Plans 3 of 3
Single Family Landscape Plans
Single Family Site Plans
Sport Complex Architectural Plans
Sport Complex Landscape Plans
Sport Complex Site Plans
Town Center Commercial Architectural Plans
Town Center Commercial Landscape Plans
Town Center Commercial Site Plans
Vesting Tentative Map