|
Appendix |
Survey
Responses |
|
A |
RIVERWAY TRAILS PLAN
Survey
Response from Equestrian Groups August
2003 |
||||
|
ISSUE |
No. of YES Responses
|
ADDITIONAL
COMMENTS |
No.
of NO Responses |
ADDITIONAL
COMMENTS |
|
OK to share trail with: |
|
|
|
|
|
Dogs? |
10 |
(on
leashes) |
|
|
|
ikers/Walkers? |
8 |
Must yield right-of-way |
|
|
|
Bicyclists? |
7 1
(not sure) |
Must yield right-of-way |
|
|
|
Prefer
separation from other users? |
5 |
|
4 |
- No matter/not necessary |
|
Skaters/bladers
or skateboards? |
0 |
|
10 |
- Maybe in their own area - Go too fast for horses |
|
Linkages considered important |
3 - Connect to 2 - Under 67 bridge 2 - Connect to/continue up river 1 - 1 - Oak Creek/Palm Row 1 - To |
|
|
|
|
Most likely hours of trail use |
8 - Anytime during daylight hours 7 - Early morning, before 9 a.m. 3 - Late afternoon, after 3 p.m. 2 - Weekend 1 - 9-12 a.m. 1 - Mornings 1 - Mid-day 1 - After sunset |
|
|
|
|
Preferred trail surface material |
10 - Natural 4 - Decomposed granite (DG or
stabilized DG) 1 - DG as an alternative |
- No gravel or rocks, soft sand |
|
|
|
Preferred fencing materials |
3 - No preference 3 - No barb wire 2 - Informal split rail 1 - No metal pipe 1 - No T-posts 1 - Hitching posts |
|
|
|
|
Is
fencing needed for
safety? |
1 - if very steep 1 - possibly |
|
|
|
|
Maximum trail gradient |
2 - gradient of 2:1 1 - natural 1 - medium |
|
|
|
|
Any
problems with broad, shallow steps? |
|
|
3 |
|
|
|
||||
RIVERWAY TRAILS PLAN
Survey
Response from Equestrian Groups August
2003 |
|||||
|
ISSUE |
No. of YES Responses
|
ADDITIONAL
COMMENTS |
No.
of NO Responses |
ADDITIONAL
COMMENTS |
|
Staging Areas
|
|
|
|
|
|
|
Preferred
number of staging
areas and
location |
2 - two to three 1 - one 1
- depends on space |
|
|
|
|
|
Type
of users to be accommodated |
1 - horses 1 - all |
- No trailer spots taken by cars |
|
|
|
|
Number
of vehicles, horse
trailers, etc. to be accommodated |
1 – ten 1 - six to eight pull-thru 1 - six pull-thru 1 - ten to fifteen 1 - depends on space |
|
|
|
|
|
What
amenities should be offered? |
7 – water 5 - restrooms 2 - shade trees 2 - hitching posts 1 - car-hitch to trailers |
|
|
|
|
|
Access
/ closure of trail entrance? |
1 - No preference 1
- Leave open during summer 1 - Leave open 1
- Close |
|
|
|
|
|
Amenities/Services to be offered on trail
or at staging Areas |
10 - Drinking water for humans and animals 8 - Trash receptacles/collection 5 - Picnic areas 1 - Restroom |
- Manure dumpster at trailer parking |
|
|
|
Type of signage needed |
6 - User hierarchy 6 - Trail location
names (for emergency and orienting purposes) 5 - Emergency phones
(in case of injury) 4 - Distance markers 4 - Bike racks/Hitching
posts 3 - Hours of use (6
a.m. to 10 p.m.) 2 - Interpretive 2 - Lighting 1 - Restroom 1 - Trees |
-Lighting only if needed after dark - Buttons for lights should be well away from the
road itself - Security lighting to prevent break-ins |
|
|
|
RIVERWAY TRAILS PLAN
Survey
Response from Equestrian Groups August
2003 |
|||||
|
ISSUE |
No. of YES Responses
|
ADDITIONAL
COMMENTS |
No.
of NO Responses |
ADDITIONAL
COMMENTS |
|
|
Are there Potential Negative Effects for
Equestrians we should know about? |
|
||||
|
Erosion
control |
4 |
|
|
|
|
|
Trails
alongside slopes where land is limited |
2
|
- No cliff hangers |
|
|
|
|
Trails
that go under roadways; clearance issues, road noise |
3 |
- No bushes - Provide lots of horse crossings, lower speed
limits - 10-12’ vertical clearance |
|
|
|
|
Does your organization currently
participate in volunteer trail maintenance? |
7 |
|
|
|
|
|
Interested in volunteer trail maintenance? |
10 |
|
|
|
|
|
Would you consider use of a sack for
manure collection? |
3 |
- If necessary - To get more trails |
1 NO |
|
|
|
TOTAL
NUMBER OF SURVEYS COMPLETED: 10 |
|||||
July 17, 2003
1.
Staging Area Needs
· One-way system for trailers
· Fewer trailers needed if there are connections to other trails; unless the trail connects to a longer trail system it’s not worth using a trailer
· Use horse gates for access
· Parking needed for 5 or 10 trailers
·
· Parking lots - natural dirt or decomposed granite surface
·
· If have dumpsters, people will scoop horse manure
· Restroom in staging area
· Water
2. Amenities
Needed Along Trail
· Designate water for horses/humans
·
Traffic noise on
· Irrigation sprinklers startle horses
· Palm Row – Needs a sign that prevents riders from entering soft shoulders
· Picnic tables
· Use split rail to separate trail for horse – they sense the barrier
· Need to ensure that all users acknowledge hierarchy and yield appropriately
· High-speed bike plan?
· Signs should be at least 4’ in height and placed 3-4’ back from trail
3. Route
& Linkages
· Connection to Sycamore Trail
· Many Eucalyptus Hills people could use Palm Row for access
4.
Existing Good Examples
·
·
·
· For trail routes used, contact:
Teresa Bitondo (619) 443-7210
Gail Sabbadini (619) 443-7166
5.
Trail Maintenance and Funding
· Willing to volunteer
· Have a volunteer that knows grant writing
· Willing to volunteer with tree planting and trail maintenance
·
Would be willing to have fund raisers to raise
money
·
Sell fishing permits for money
6.
Miscellaneous
· Would like a site visit to view the trail alignment
TRAILS WISH LIST
Compiled by
the SD
1. Horse hitching posts with shade.
2. Water troughs and/or access to drink.
3. Signs
regarding right of way (bikers yield to hikers and horses, hikers yield to
horses.)
4.